Ready to build!
The holes for the poles were 2 feet deep. Using a post hole digger and newly- wet dirt thanks to the perfect timing of a rainstorm, the dig was fast and relatively easy.
The posts were leveled, checked and re-checked and a stabilizing triangle was created with stakes, poles and screws.
Quickrete is amazing. Pour in some water, add some quickrete. Add water, add quickrete, aerate/ mix in the hole itself. It sets in less than 1 hour. Wow!
Dumping the dirt!
The holes for the poles were 2 feet deep. Using a post hole digger and newly- wet dirt thanks to the perfect timing of a rainstorm, the dig was fast and relatively easy.
The posts were leveled, checked and re-checked and a stabilizing triangle was created with stakes, poles and screws.
Quickrete is amazing. Pour in some water, add some quickrete. Add water, add quickrete, aerate/ mix in the hole itself. It sets in less than 1 hour. Wow!
Dumping the dirt!
Final Product:
Comments
Post a Comment